dc.identifier.citationComputers & Operations Research. In Press, Corrected Proof:en_US
dc.identifier.urihttps://hdl.handle.net/10316/3772-
dc.description.abstractThis paper addresses the optimal design of the grinding section of a ceramic tile plant operating in a cyclic mode with the units (mills) following a batch sequence. The optimal design problem of this single product plant is formulated with a fixed time horizon of one week, corresponding to one cycle of production, and using a discrete-time resource task network (RTN) process representation. The size of the individual units is restricted to discrete values, and the plant operates with a set of limited resources (workforce and equipment). The goal is to determine the optimal number and size of the mills to install in the grinding section, the corresponding production schedule, and shift policy. This problem involves labor/semi-labor intensive (LI/SLI) units with a depreciation cost of the same order as that of the operation cost. The optimal design of the grinding section comprises the trade-off between these two costs. The resulting optimization formulation is of the form of a mixed integer linear programming (MILP) problem, solved using a branch and bound solver (CPLEX 9.0.2). The optimal solution is analyzed for various ceramic tile productions and different shift policies.Scope and Purposeen_US
dc.description.urihttp://www.sciencedirect.com/science/article/B6VC5-4SJ2WWC-1/1/3b1c46a108097a375d39b9eac02ce552en_US
dc.format.mimetypeaplication/PDFen
dc.language.isoengeng
dc.rightsopenAccesseng
dc.subjectSchedulingen_US
dc.subjectResource task networken_US
dc.subjectMixed-integer linear programmingen_US
dc.subjectCeramic industryen_US
dc.titleOptimal sizing, scheduling and shift policy of the grinding section of a ceramic tile planten_US
dc.typearticleen_US
dc.identifier.doi10.1016/j.cor.2008.05.007-
item.openairetypearticle-
item.fulltextCom Texto completo-
item.languageiso639-1en-
item.grantfulltextopen-
item.cerifentitytypePublications-
item.openairecristypehttp://purl.org/coar/resource_type/c_18cf-
crisitem.author.researchunitCIEPQPF – Chemical Process Engineering and Forest Products Research Centre-
crisitem.author.researchunitCIEPQPF – Chemical Process Engineering and Forest Products Research Centre-
crisitem.author.parentresearchunitFaculty of Sciences and Technology-
crisitem.author.parentresearchunitFaculty of Sciences and Technology-
crisitem.author.orcid0000-0003-2550-4320-
crisitem.author.orcid0000-0003-0568-917X-
Appears in Collections:FCTUC Eng.Química - Artigos em Revistas Internacionais
Files in This Item:
File Description SizeFormat
filebb0362f6a4d44782aaf8d36ccf0a39b8.pdf387.48 kBAdobe PDFView/Open
Show simple item record

SCOPUSTM   
Citations

10
checked on Jul 15, 2024

WEB OF SCIENCETM
Citations

9
checked on Jul 2, 2024

Page view(s)

255
checked on Jul 16, 2024

Download(s)

324
checked on Jul 16, 2024

Google ScholarTM

Check

Altmetric

Altmetric


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.