Please use this identifier to cite or link to this item: https://hdl.handle.net/10316/86440
DC FieldValueLanguage
dc.contributor.advisorGomes, Álvaro Filipe Peixoto Cardoso de Oliveira-
dc.contributor.authorNeves, Marco António Caetano Lourenço das-
dc.date.accessioned2019-04-17T22:19:17Z-
dc.date.available2019-04-17T22:19:17Z-
dc.date.issued2018-09-24-
dc.date.submitted2019-04-17-
dc.identifier.urihttps://hdl.handle.net/10316/86440-
dc.descriptionDissertação de Mestrado Integrado em Engenharia Electrotécnica e de Computadores apresentada à Faculdade de Ciências e Tecnologia-
dc.description.abstractO mercado de energia elétrica em Portugal evoluiu de totalmente regulado para liberalizado, passando por várias etapas. Atualmente com o MIBEL, a produção de energia elétrica caracteriza-se por um ambiente competitivo com diversos fatores como a entrada das renováveis, as condições hidrológicas, a descarbonização do parque electroprodutor, com o respetivo contrabalanço da variabilidade do consumo assente na base económica com as conhecidas flutuações.Apresentando estes pressupostos do mercado, uma central de ciclo combinado a gás natural, que inicialmente, em projeto, incorporava a base do diagrama, procura agora flexibilizar-se e entrar nas oportunidades de mercado, por forma a maximizar o retorno do investimento. Um pilar extremamente importante nesta posição perante o mercado é a função manutenção e a sua estratégia.A manutenção procura exponenciar a disponibilidade dos equipamentos com elevados padrões de fiabilidade. Para conseguir este objetivo, a estratégia da manutenção passa por utilizar ferramentas que permitam a otimização dos seus planos de manutenção, como o Plano de manutenção Preventiva. A metodologia Reability Centered in Maintenance produz resultados no sentido da gestão da manutenção, do equipamento, com base na sua criticidade no processo e custos (de corretiva e de preventiva).Enquadrando a metodologia RCM e a voracidade e velocidade de resultados em mercado, as empresas do sector elétrico, optam pela aplicação do SRCM Streamlined Reability Centered in Maintenance, que produz resultados mais rápidos, e comprovados pela EPRI, fiáveis como o RCM. O objetivo desta dissertação é expor a aplicação do SRCM a um sistema da central de ciclo combinado – sistema elétrico de muita alta tensão (subestação). O presente trabalho foi desenvolvido no âmbito da unidade curricular Dissertação do Mestrado Integrado em Engenharia Eletrotécnica e de Computadores, leccionada no Departamento de Engenharia Eletrotécnica e de Computadores da Faculdade de Ciências e Tecnologias da Universidade de Coimbra, no ano lectivo 2017/2018.por
dc.description.abstractThe electricity market in Portugal has developed from fully regulated to liberalized, going through several stages. Currently with MIBEL, the production of electric energy is characterized by a competitive environment with several factors such as the entry of renewables, hydrological conditions, decarbonization of the generation portfolio, with the respective other side of the coin with the variability of the demand, based on the variations of the economic.With these market assumptions, a natural gas combined cycle plant, which initially design to be working in the basis of the load profile, now seeks to become more flexible and to be ready for market opportunities, in order to maximize the return on investment. An extremely important support of this position is the maintenance function and its strategy.Maintenance seeks to expose the availability of equipment with high standards of reliability. To achieve this goal, the maintenance strategy is to use tools/methods that allow the optimization of the maintenance plans, such as the Preventive Maintenance Plan. The Reliability Centered in Maintenance is one of the methodology that produces results in the management of maintenance, based on equipment criticality in the process and costs (corrective and preventive maintenance).Because of the voracity and speed of results in the market, companies in the electricity sector had made the option for implement SRCM Streamlined Reliability Centered in Maintenance, which produces faster results and proven by EPRI, with the same quality of the RCM. The objective of this thesis is to revel the implementation of the SRCM to a system of combined cycle power plant – substation system.The present work was developed under the scope of the curricular unit Masters’ thesis in Electrical and Computer Engineering, taught in the Department of Electrical and Computer Engineering of the Faculty of Science and Technology, Coimbra University, in the school year 2017/2018.eng
dc.language.isopor-
dc.rightsopenAccess-
dc.rights.urihttp://creativecommons.org/licenses/by-sa/4.0/-
dc.subjectMercado eléctrico liberalizadopor
dc.subjectRCMpor
dc.subjectPlano Manutenção Preventivapor
dc.subjectFiabilidadepor
dc.subjectGestão de Ativospor
dc.subjectElectrical Liberalized Marketeng
dc.subjectRCMeng
dc.subjectPreventive Maintenance Planeng
dc.subjectReliabilityeng
dc.subjectAsset Managementeng
dc.titleMetodologia Reliability Centered in Maintenance aplicada numa uma central de ciclo combinado em ambiente de mercado de energia elétrica liberalizadopor
dc.title.alternativeReliability Centered in Maintenance methodology applied in a combined cycle power plant in a liberalized electricity market environmenteng
dc.typemasterThesis-
degois.publication.locationDEEC-
degois.publication.titleMetodologia Reliability Centered in Maintenance aplicada numa uma central de ciclo combinado em ambiente de mercado de energia elétrica liberalizadopor
dc.peerreviewedyes-
dc.identifier.tid202220117-
thesis.degree.disciplineEngenharia Electrotécnica e de Computadores-
thesis.degree.grantorUniversidade de Coimbra-
thesis.degree.level1-
thesis.degree.nameMestrado Integrado em Engenharia Electrotécnica e de Computadores-
uc.degree.grantorUnitFaculdade de Ciências e Tecnologia - Departamento de Eng. Electrotécnica e de Computadores-
uc.degree.grantorID0500-
uc.contributor.authorNeves, Marco António Caetano Lourenço das::0000-0002-6408-2434-
uc.degree.classification15-
uc.degree.presidentejuriAntunes, Carlos Alberto Henggeler de Carvalho-
uc.degree.elementojuriGomes, Álvaro Filipe Peixoto Cardoso de Oliveira-
uc.degree.elementojuriGomes, Teresa Martinez dos Santos-
uc.contributor.advisorGomes, Álvaro Filipe Peixoto Cardoso de Oliveira-
item.openairetypemasterThesis-
item.fulltextCom Texto completo-
item.languageiso639-1pt-
item.grantfulltextopen-
item.cerifentitytypePublications-
item.openairecristypehttp://purl.org/coar/resource_type/c_18cf-
crisitem.advisor.researchunitINESC Coimbra – Institute for Systems Engineering and Computers at Coimbra-
crisitem.advisor.orcid0000-0003-1229-6243-
Appears in Collections:UC - Dissertações de Mestrado
Show simple item record

Page view(s) 50

443
checked on Jul 16, 2024

Download(s) 50

833
checked on Jul 16, 2024

Google ScholarTM

Check


This item is licensed under a Creative Commons License Creative Commons