Please use this identifier to cite or link to this item: https://hdl.handle.net/10316/14423
DC FieldValueLanguage
dc.contributor.authorKorobeinikov, Andrei-
dc.contributor.authorKovacec, Alexander-
dc.contributor.authorMcGuinness, Mark-
dc.contributor.authorPascoal, Marta-
dc.contributor.authorPereira, Ana-
dc.contributor.authorVilela, Sónia-
dc.date.accessioned2011-01-28T16:09:55Z-
dc.date.available2011-01-28T16:09:55Z-
dc.date.issued2010-
dc.identifier.citationKOROBEINIKOV, Andrei [et al.] - Optimizing the profit from a complex cascade of hydroelectric stations with recirculating water. "MICS Journal". ISSN 1913-4967. Vol. 2 (2010) 111-133-
dc.identifier.issn1913-4967-
dc.identifier.urihttps://hdl.handle.net/10316/14423-
dc.description.abstractIn modern reversible hydroelectric power stations it is possible to reverse the turbine and pump water up from a downstream reservoir to an upstream one. This allows the use of the same volume of water repeatedly and was specifically developed for hydro-electric stations operating with insufficient water supply. Pumping water upstream is usually done at times of low demand for electricity, to build up reserves in order to be able to produce energy during peak hours, thus balancing the load and making a profit on the price difference. In this paper, we consider a branched model for hydroelectric power stations interacting in a complex cascade arrangement. The goal of this study is to provide guidance in decision-making aimed at maximizing the profit. A detailed analysis is made of a simpler reservoir configuration, which indicates that even though the problem is nonlinear, a bang-bang type of control is optimal, where the power stations are operated at maximum rates of flow. Some simple relation- ships between price and timing of decisions are calculated directly. A numerical algorithm is also developed.por
dc.language.isoengpor
dc.rightsopenAccesspor
dc.subjectOptimizationpor
dc.subjectHydroelectric powerpor
dc.subjectBranched cascadepor
dc.subjectReversible turbinespor
dc.subjectCase studypor
dc.titleOptimizing the profit from a complex cascade of hydroelectric stations with recirculating waterpor
dc.typearticlepor
degois.publication.firstPage111por
degois.publication.lastPage133por
degois.publication.titleMICS Journalpor
dc.peerreviewedYespor
degois.publication.volume2por
item.openairecristypehttp://purl.org/coar/resource_type/c_18cf-
item.openairetypearticle-
item.cerifentitytypePublications-
item.grantfulltextopen-
item.fulltextCom Texto completo-
item.languageiso639-1en-
crisitem.author.deptFaculty of Sciences and Technology-
crisitem.author.parentdeptUniversity of Coimbra-
crisitem.author.researchunitCMUC - Centre for Mathematics of the University of Coimbra-
crisitem.author.orcid0000-0003-0517-677X-
Appears in Collections:FCTUC Matemática - Artigos em Revistas Internacionais
Files in This Item:
Show simple item record

Page view(s) 50

444
checked on Apr 9, 2024

Download(s) 50

349
checked on Apr 9, 2024

Google ScholarTM

Check


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.